650V Feeder Renewals & PSP Design, London to Corby (L2C)
Dates: 2018-Ongoing
Client: Siemens Mobility Ltd
SVM delivered the E&P LV GRIP 4/5 surveys and designs for the new 650V signalling power installations between Bedford and Kettering consisting of 2Nr. new DNO, generator and traction derived PSPs at Wellingborough and Sharnbrook, serving 4Nr. new Class II feeders. The design was co-ordinated against the major Midland Mainline (MML) electrification scheme, with SVM also providing the L2C Earthing and Bonding Strategy, FTN REB source power designs, DNO procurement and East Midlands Control Centre designs.